Fit Out DirectionsFit Out Directions
AR

Services

Fit-out, decorative work, and the details that get lost on site.

Interior fit-out, furniture, lighting, cladding, coordination, site direction, and handover. The same people holding the drawings and the programme.

01

Interior fit-out

Partitions, ceilings, flooring, cladding, and decorative finishes. The work that turns a drawing into a room you can hand over.

02

FF&E / OS&E coordination

Furniture, fixtures, equipment, and opening supplies treated as one package — not a leftover list after the builder leaves.

03

Furniture, lighting, and cladding

Loose and fixed furniture, decorative lighting, wall cladding. The pieces on the drawing that have to land in the right millimetre.

04

Site direction and handover

Programme, inspections, snagging, and a handover you can walk. Someone on site who has read the drawings.

Scope of Work

The list, in full.

What we take on, item by item. If a package is not on this list, ask — some jobs sit across several lines.

01

Turnkey Projects

One point of contact from coordination through to a finished handover.

On the job:

  • programme control
  • trade coordination
  • snagging and handover
02

Furniture

Furniture packages that match the drawings and how the room is actually used.

On the job:

  • specification support
  • supplier lead times
  • placement on site
03

Loose Furniture

Seating, tables, and loose pieces brought in as part of the finished room, not as an afterthought.

On the job:

  • procurement
  • delivery slots
  • installation sequence
04

Fixed Furniture

Joinery and built-ins set out against site dimensions, finishes, and MEP.

On the job:

  • shop drawing review
  • site measure
  • install against finishes
05

FF&E

Furniture, fixtures, and equipment run as one package, with one schedule.

On the job:

  • package schedules
  • supplier coordination
  • final set-out
06

OS&E

Operating supplies and equipment listed, received, and ready for opening.

On the job:

  • inventory lists
  • opening checklist
  • handover with the operator
07

Cladding

Interior and feature cladding, with the junctions and edges held to the drawing.

On the job:

  • material coordination
  • setting-out
  • junctions and edges
08

Decorative Works

Feature finishes and crafted pieces that have to land as drawn, not approximately.

On the job:

  • feature coordination
  • sample sign-off
  • site execution
09

Stainless Steel Decorative Items

Decorative metalwork controlled through fabrication, finish sample, and install.

On the job:

  • fabrication coordination
  • finish samples
  • installation checks
10

Lighting

Decorative and architectural lighting coordinated with ceilings, cut-outs, and finishes.

On the job:

  • fixture coordination
  • ceiling interfaces
  • scene set
11

Facade

Frontage and entrance work aligned with access, materials, and the finish on the inside.

On the job:

  • frontage detailing
  • material junctions
  • install sequence
12

Curtains & Window Treatments

Curtains, tracks, and dressings coordinated with the interior and how they operate.

On the job:

  • fabric coordination
  • track interfaces
  • final dressing
13

Carpet

Carpet and soft flooring with pattern, seams, and edges under control.

On the job:

  • pattern setting-out
  • seam control
  • edge finishing
14

Artwork

Positions, fixings, and alignment so the art sits where the drawing said it would.

On the job:

  • placement
  • fixing coordination
  • final alignment
15

Sculpture

Feature objects handled as part of the build: base, access, and install.

On the job:

  • base coordination
  • handling
  • installation control
16

Special Paint Finishes

Special paint systems sampled, signed off, then held consistent on the wall.

On the job:

  • mock-ups
  • sample boards
  • finish consistency

Contact

Send the drawings.